Projects
Deluxe Laboratories
Denham, Uxbridge
-
Main Contractor - Weston Homes
-
Refurbishment of Deluxe film studios. Steelwork to support the removal of floors to create a full height atrium.
Lockmeadow Lesiure Centre
Maidstone, Kent
-
Main Contractor - MAC Interiors
-
New canopy and signage box to the existing external facade of the leisure complex building. This also included a plantroom frame and parapet wall steelwork.
Park Primary school - Phase 2
Stratford, London
-
Main Contractor - Jerram Falkus
-
New school extension.
The Depot Cinema
Lewes
-
Main Contractor - R. Durtnell & Sons
-
Refurbishment and extension of the existing Harvey's Depot building and conversion to provide a new cinema.
Great Swifts Manor
Cranbrook
-
Main Contractor - Cheesmur
-
Steelwork for the new pool building.
Gateway Church
Eastbourne
-
Main Contractor - Cheesmur
-
Steelwork for the new church building
Hollingdean Depot
Brighton
-
Main Contractor - Westridge Construction
-
Steelwork for the new depot building including long spanning Westok cellular beams.
Holmewood House School
Tunbridge Wells
-
Main Contractor - Coombs
-
Steelwork for the new two storey block containing learning hub area and teaching spaces. Open plan area achieved by trusses supporting the first floor from roof level above.
Holy Trinity Church
Hove
-
Main Contractor - Westridge Construction
-
Conversion of the 150 year old grade II listed church to a medical centre and pharmacy.
Park Primary School Phase 1
Stratford, London
-
Main Contractor - Jerram Falkus
-
New classroom block
Saltdean School
Saltdean, Brighton
-
Main Contractor - Westridge Construction
-
New school extensions and external staircase for Brighton and Hove county council.
1 - 2 Stephen Street
London
-
Main Contractor - Balfour Beatty
-
Mezzanine floor and canopy support steelwork to increase the commercial potential of the site and will extend to include the adjoining retail frontages on Tottenham Court Road
Pelham Primary School
London
-
Main Contractor - Balfour Beatty
-
Kitchen extension with roof trusses to match the existing ones within the building.
Goldwater Lodge, Community Hall
Woking
-
Main Contractor - Mountjoy Ltd
-
Replacement building due to fire damage. The existing columns were cut down and the new steel frame was spliced on top of this.
Bridge Road Depot
Haywards Heath
-
Main Contractor - Mid Sussex District Council
-
New Depot, office, landscape store, salt store and 4 staircases for SERCO
Bolnore Village Hall
Bolnore, Haywards Heath
-
Main Contractor - Mid Sussex District Council
-
New village hall
College Farm
Enfield, London
-
Main Contractor - Jerram falkus construction Ltd.
-
'New Options' Day Care Centre
Foxfield Primary School - Phase 2
Woolwich, London
-
Main Contractor - Mansell Construction.
-
Phase 2 of the new school development.
Worthing Yacht Club
Worthing, West Sussex
-
Main Contractor - Kier Homes (Bedfordshire).
-
30t Steel frame for new Yacht Club.
Ardingly College
Ardingly , West Sussex
-
Main Contractor - Mansell Construction (Croydon).
-
160t Steel frame for new bording.
Westminster Business Square
Westminster, London
-
Main Contractor - Mansell Construction (London).
-
25t Steel frame for new offices. Braced with Macalloy Tension system.
Hammersmith Medicines Research
Hammersmith, London
-
Main Contractor - Longcross Construction.
-
10t Two storey extension to existing building.
Oast Theatre
Tonbridge, East Sussex
-
Main Contractor - Coombes Limited.
-
14t Extension to existing theatre builing.
Foxfield Primary School - Phase 1
Woolwich, London
-
Main Contractor - Mansell Construction.
-
Phase 1 of the new school development.
346 Seaside - New Coop and Offices
Eastbourne
-
Main Contractor - BCL Construction.
-
26 tonnes of steelwork for the ground floor shop and to support a timber frame above.
Singlegate Primary School
London Borough of Merton
-
Main Contractor - Mansell Construction.
-
17 tonnes of steelwork for the new school building.
Malden Hall - External Stair Tower
New Malden, London
-
Main Contractor - Collen Redwing.
-
New external stair tower and stairs including balustrade. All Galvanized as it will be exposed to the elements.
Archbishop Courtenay School
45 Park Lane, London
-
Main Contractor - Mansell.
-
65 Tonnes of Steelwork for the new school. Photographs showing Roof steelwork for the main hall.
45 Park Lane - First Floor Canopy: Before and After
45 Park Lane, London
-
Main Contractor - Kier.
-
Before and After of the Stainless Steel Canopy around the perimeter of the building.
45 Park Lane - Balcony Artwork: Before and After
45 Park Lane, London
-
Main Contractor - Kier.
-
Before and after photos showing the steelwork and artwork installed.
45 Park Lane - First Floor Canopy
45 Park Lane, London
-
Main Contractor - Kier.
-
Canopy Steelwork for the Stainless Steel Canopy around the perimeter of the building. As part of the Refurbishment of 45 Park Lane for the new Dorchester collection hotel.
45 Park Lane - Artwork support Steelwork
45 Park Lane, London
-
Main Contractor - Kier.
-
Steelwork to support the external full height balcony Artwork. As part of the Refurbishment of 45 Park Lane for the new Dorchester collection hotel.
Photovoltaic Panel Access Walkway
University of Greenwich, Medway Campus
-
Main Contractor - Kier.
-
Steel Access for maintenance of Photovoltaics
New Sea Cadets Centre
Woking
-
Main Contractor - Mansell.
-
New Steel frame for Sea Cadets centre
Nike Town
Nike Town Store, Oxford Street
-
Main Contractor - Kier Wallis.
-
Live Store Refurbishment - escalator support Steelwork.
Click here for more projects - Page 2